Six Quotes, Six Prices, One Door: How to Read a Garage Door Quote Properly
Photo: homeowner comparing printed garage door quotes at kitchen table with calculator uk, via lookaside.instagram.com
Three quotes land on the kitchen table. One is £1,450. One is £2,180. One is £3,300. They are all for the same door. Nobody is lying, exactly — but you are being asked to compare three different jobs wearing the same description.
Comparing garage door quotes is mostly about forcing them onto the same page. Here is a working method, plus the questions worth emailing before anyone gets your deposit.
1. Ask for the same door, in writing
Before quotes, fix the specification: door type, size, material, insulation, colour, window options, and whether you want automation. Send that same paragraph to every firm. If a company quotes something different, that is fine — but it should say so on the quote, not turn up on fitting day with a surprise.
2. Interrogate the specification, not the photograph
A brochure photo tells you nothing. Ask for the manufacturer, model name and a datasheet. On steel doors, look at panel thickness and the insulation core — EPS, PU, or nothing at all. Thermal performance is quoted as a U-value in W/m²K, where lower is better, and it only means anything alongside decent seals and a properly fitted frame. Two quotes with identical wording can hide an insulated door and a single-skin one, and the price gap between them is real.
3. Removal and disposal — whose skip?
Itemise it. Old door off, taken away, waste carrier's licence number available on request. Some quotes quietly exclude disposal, and you are left with a twisted steel panel in the front garden and a trip to the tip. If there is an old operator, a rotten frame or a lintel to come out, it should appear as its own line.
4. Structural work and making good
Does the price include adjusting an out-of-square opening, refitting a frame, brickwork, or plastering the internal reveal? Most garage openings are not square, and honest firms say so up front. The others discover it halfway through and hand you a variation.
5. Electrics
If you are having a motor, where does the power come from? A quote that assumes a handy socket already exists can be several hundred pounds light. Ask whether the electrical work is included, who does it, and whether you get a certificate.
6. VAT — the oldest trick in the book
One quote says £2,100. Another says £2,100 plus VAT, which is £2,520. Always convert to a VAT-inclusive figure before comparing anything. Domestic garage door installation is standard-rated at 20%; the reduced 5% rate applies in specific circumstances, such as renovating a home that has stood empty for two years or more. If one quote is dramatically cheaper than the rest, VAT is one of the two usual reasons — the other is a much cheaper door.
7. Guarantees — and who is actually standing behind them
Ask three things: how long, on what, and who honours it. A typical split is up to ten years on the door from the manufacturer, two to five on the operator, and one to two on installation workmanship. An insurance-backed guarantee is worth having if the company is young. Also ask what voids it — self-fitting, a non-approved operator, or missed annual checks.
8. The boring paperwork
Check the company number on Companies House, ask for public liability insurance (ideally £5 million), and look for membership of a trade body such as the Door & Hardware Federation, TrustMark, or a recognised trader scheme. Not because a logo makes a good fitter, but because the bad ones usually cannot be bothered.
9. Payment schedule
A sensible split is a modest deposit, possibly a stage payment, and the balance on completion. Be wary of anything above 25% up front, and very wary of a request for cash. Paying the deposit by credit card gives you Section 75 protection on purchases over £100, which is cheap insurance.
10. Lead times and the small print
Six weeks is normal for a made-to-measure door; twelve is not unheard of. Ask what happens if the date slips and whether the price is fixed. Under the Consumer Contracts Regulations you generally have 14 days to change your mind on an order placed at home — unless you ask for work to start sooner, which is exactly why some salespeople push for a quick start date.
11. Aftercare
What is the call-out charge in year three? How fast do they respond if the door will not close in December? Is a service visit included, and what does it cover? A firm that answers these cheerfully is usually a firm that will still answer the phone later.
12. Red flags
- A quote with no address, company number or VAT number.
- A discount that expires tonight.
- No site survey — just a phone call and a price.
- Anything over 25% deposit, or a request for cash.
- Nobody mentions removal, electrics or VAT.
- Pressure to sign on the evening of the visit.
A simple scoring method
Make a spreadsheet. One row per quote, one column per criterion, score each out of five, and weight them roughly like this:
- Door specification and suitability: 25%
- Total price, VAT included: 25%
- Guarantees and aftercare: 20%
- Accreditations and insurance: 15%
- Reviews and gut feel: 15%
Add up the weighted scores. The cheapest quote rarely wins, and the dearest one does not automatically either — the winner is normally the one that answered the awkward questions properly.
The email to send before you decide
Something like: thanks for the quote — can you confirm the door model and U-value, whether removal and disposal are included, whether the price is fixed and VAT-inclusive, the length and provider of each guarantee, and the call-out policy after year one?
The replies will tell you more than the prices did. A good quote is dull: itemised, dated, signed, and specific about what it does and does not cover. Boring is what you want on the paperwork. Save the excitement for the door.